DynaCool is a new member to the MCC family. It is being installed and takes one week to finish. The cryogen free system is dedicated for electrical resistivity measurement...
The Rigaku SmartLab XRD one month test run will be complete by the end of July and the regular operation is scheduled on August 1st, 2016 at a hourly rate of 15 dollars. The...
The Hitachi service engineer, Bill Hardy has just replaced the specimen chamber door which lowers the “EXC” position from 8 mm to 13 mm. A new detection mode “FQ-EDX”, the...
Following the hardware upgrade on 7/26, an updated version of SEM SOP was uploaded on the Core webpage. Users are required to follow strictly the new SOP, especially the EDS...
The wirebonder was installed on 6/23/2016 and being tested now. It can be used for the DynaCool PPMS at Crisp once a puck carrier is ready.
The PHI VPII XPS maintenance service is finished. The users can start reservation now. There are some updates:
The new version SmartSoft was installed and tested. Please...
XPS users,
the PHI company service engineer will come to do some maintenance works including a frame support install for transfer rod and main chamber stage calibration. It...